The Etobicoke Waste Transfer Station project posed several challenges with the initially specified HVAC system, which required multiple pieces, complex installation, and extensive fieldwork. Our team at O’Dell seized the opportunity to offer a more efficient and integrated solution using Envent/LG technology, resulting in a streamlined process and enhanced performance.

Challenges

The Etobicoke Waste Transfer Station project was a design-build where the engineer specified a different Air Handling unit combined with a 20-ton VRF condensing unit to provide heating and cooling. This specified product required electrical connections and disconnects, separate pieces that all needed to be craned and installed by the contractor. It also required the contractor to do all field refrigeration piping between the (2) condensing units and the air handler.

The Solution

A long lead time from the specified product allowed us the opportunity to present a new solution. We approached both the engineer (WalterFedy) and contractor (Process Group) with an alternate option from Envent/LG that provided the following benefits:

  • Envent factory installs the LG condensing unit and does all the control wiring and refrigeration piping at the factory.
  • Whole assembly is factory tested.
  • Single packaged unit that only required (1) crane lift.
  • Single point power connection.
  • (1) 20-ton VRF chassis vs (2) 10-ton chassis from the competitor – lighter unit and lower MCA/MOP.
  • Better lead time.

Our Approach

By proposing the Envent/LG solution, we streamlined the installation process for the contractor and provided a more efficient and timely option. The single packaged unit required fewer crane lifts and electrical connections, and the factory-installed components ensured quality and consistency.

Conclusion

The engineer and contractor both really liked the solution we proposed and how much easier of an installation it was going to be compared to the specified product. They awarded us the order, validating our approach. Contact us to learn how we can build a custom solution for your project.

Recent Projects

Explore Our Projects
Canadian Canoe Museum
Discover how the Canadian Canoe Museum, a unique national heritage centre with over 100 canoes and kayaks on display, embraced innovative HVAC solutions to enhance energy efficiency.
More Details about Canadian Canoe Museum
Capreit 15 Tangreen Project Profile
In collaboration with a mechanical consultant, we overcame significant challenges to upgrade the HVAC system of a residential REIT building.
More Details about Capreit 15 Tangreen Project Profile
Chemtura
To support its growth, Chemtura Corporation constructed a new laboratory in Guelph, Ontario, featuring a sophisticated lab exhaust solution designed by us in collaboration with WalterFedy.
More Details about Chemtura
Folkway Music
Folkway Music, renowned for its vintage and unique guitars, partnered with us to implement a reliable humidification system.
More Details about Folkway Music
Urban Tactical
We collaborated with a design-build contractor to implement advanced ventilation solutions for Urban Tactical, a firing range in Brantford.
More Details about Urban Tactical
Schembri Property Management
Thirty-one Kingsbury Drive in Kitchener, Ontario, is a shell office building built by Schembri Property Management. The consultancy firm of M.A. Bryan Engineering was retained to complete the job.
More Details about Schembri Property Management