100% Efficient Energy Recovery – Say What?

Blog
Decarbonization

Achieving one hundred percent efficient energy recovery is the holy grail of energy efficiency. It also happens to be thermodynamically possible if you have an infinite heat exchanger in a counter-flow arrangement. Do we have the space for this in today’s buildings? No, but is it possible? Yes! And it goes by the name of enVerid.

By applying ASHRAE 62.IAQ procedure (IAQp), in conjunction with enVerid gas-phase filtration, you can effectively reduce ventilation requirements to your building, while maintaining a healthy environment. On average, a single enVerid unit can reduce ventilation by up to 2,000-cfm. Think of it as a 100% efficient, 2,000-cfm energy recovery ventilator—imagine the savings! Or to be specific:

  • Heating: 162,000-BTU/hr
  • Cooling: 134,876-BTU/hr
    • Sensible: 68,188-BTU/hr
    • Latent: 66,688-BTU/hr
  • Humidification: 55-LBS/hr

Basically, the cost of integrating an enVerid unit is offset by the savings in the central plant or air handling unit. How’s that for value?

Give us a call at O’Dell Associates and we’ll show how to start saving energy in your buildings and/or designs. We’ll even do the 62.1 IAQp calculations for you.

 

Recent Projects

Explore Our Projects
Canadian Canoe Museum
Discover how the Canadian Canoe Museum, a unique national heritage centre with over 100 canoes and kayaks on display, embraced innovative HVAC solutions to enhance energy efficiency.
More Details about Canadian Canoe Museum
Capreit 15 Tangreen Project Profile
In collaboration with a mechanical consultant, we overcame significant challenges to upgrade the HVAC system of a residential REIT building.
More Details about Capreit 15 Tangreen Project Profile
Chemtura
To support its growth, Chemtura Corporation constructed a new laboratory in Guelph, Ontario, featuring a sophisticated lab exhaust solution designed by us in collaboration with WalterFedy.
More Details about Chemtura
Folkway Music
Folkway Music, renowned for its vintage and unique guitars, partnered with us to implement a reliable humidification system.
More Details about Folkway Music
Urban Tactical
We collaborated with a design-build contractor to implement advanced ventilation solutions for Urban Tactical, a firing range in Brantford.
More Details about Urban Tactical
Schembri Property Management
Thirty-one Kingsbury Drive in Kitchener, Ontario, is a shell office building built by Schembri Property Management. The consultancy firm of M.A. Bryan Engineering was retained to complete the job.
More Details about Schembri Property Management